Commit graph

3 commits

Author SHA1 Message Date
Renovate Bot
212e8ac348 Update module github.com/golangci/golangci-lint/v2/cmd/golangci-lint to v2.2.1 (forgejo) (#8422)
Some checks failed
/ release (push) Waiting to run
testing-integration / test-unit (push) Waiting to run
testing-integration / test-sqlite (push) Waiting to run
testing / backend-checks (push) Waiting to run
testing / frontend-checks (push) Waiting to run
testing / test-unit (push) Blocked by required conditions
testing / test-e2e (push) Blocked by required conditions
testing / test-remote-cacher (redis) (push) Blocked by required conditions
testing / test-remote-cacher (valkey) (push) Blocked by required conditions
testing / test-remote-cacher (garnet) (push) Blocked by required conditions
testing / test-remote-cacher (redict) (push) Blocked by required conditions
testing / test-mysql (push) Blocked by required conditions
testing / test-pgsql (push) Blocked by required conditions
testing / test-sqlite (push) Blocked by required conditions
testing / security-check (push) Blocked by required conditions
Integration tests for the release process / release-simulation (push) Has been cancelled
Reviewed-on: https://codeberg.org/forgejo/forgejo/pulls/8422
Reviewed-by: Gusted <gusted@noreply.codeberg.org>
Co-authored-by: Renovate Bot <forgejo-renovate-action@forgejo.org>
Co-committed-by: Renovate Bot <forgejo-renovate-action@forgejo.org>
2025-07-05 18:33:45 +02:00
Lunny Xiao
54f2dcff9d
Upgrade xorm to v1.3.9 and improve some migrations Sync (#29899)
Co-authored-by: 6543 <6543@obermui.de>
(cherry picked from commit 0d08bb6112884411eb4f58b056278d3c824a8fc0)
2024-07-22 15:44:13 +02:00
yp05327
07ba4d9f87
Fix incorrect action duration time when rerun the job before executed once (#28364)
Fix #28323
Reason was mentioned here:
https://github.com/go-gitea/gitea/issues/28323#issuecomment-1841867298

### Changes: (maybe breaking)
We can rerun jobs in Gitea, so there will be some problems in
calculating duration time.
In this PR, I use the exist `Started` and `Stopped` column to record the
last run time instead of the total time,
and add a new `PreviousDuration` column to record the previous duration
time.
You can also check the cost time of last run:

![image](https://github.com/go-gitea/gitea/assets/18380374/2ca39145-2c92-401a-b78b-43164f7ae061)
2024-01-19 14:05:49 +00:00